Our Work

Nova Space Business Center

Our diverse portfolio represents decades of construction experience backed by a passion for quality, outstanding client service and the latest industry technologies.

World Trade Center - Dubai

Nova Space Business Center

Project

Nova Space

Region

Court Tower

City

Dubai

Sector

Interior Design, Fit-out, Technical Services & Renovations. Turnkey Project.

About Project

 Crest View Building Contracting Company was entrusted with the renovation and interior fit-out services for a prestigious business center, transforming it into a modern, functional, and stylish work environment. The goal was to create a dynamic space that caters to the needs of businesses while offering a professional and comfortable atmosphere for clients, employees, and visitors. The project aimed to blend cutting-edge design with operational efficiency, ensuring all work adhered to the highest standards.

Mandatory terms of the contract & Interior Renovation Work Performed

Led the design and execution of architectural changes, including space reconfiguration and aesthetic upgrades to maximize functionality and aesthetic appeal of the business center.
Developed detailed 3D renderings to visualize the design concepts, allowing for client feedback and adjustments before final execution.
Transformed the reception area into a welcoming, high-end space with custom-designed furniture, modern finishes, and a professional ambiance.
Installed and optimized HVAC systems throughout the business center, ensuring a comfortable and climate-controlled environment for both staff and visitors.
Applied high-quality paint finishes to walls and ceilings, enhancing the overall aesthetic with a contemporary color palette that complemented the modern design.
Completed sophisticated tiling works in key areas such as the lobby, corridors, and restroom facilities, using premium materials to match the business center’s upscale look.
Managed the installation of mechanical, electrical, and plumbing systems, ensuring operational efficiency and compliance with all safety standards.
Installed sleek, modern glass features including partitions, windows, and doors to enhance the center’s light-filled and open design while maintaining privacy and noise reduction.
Integrated durable and stylish aluminum frames for doors, windows, and partitions, contributing to the modern aesthetic while ensuring strength and durability.
Created functional, flexible office spaces with the installation of high-quality gypsum partitions, enabling adaptable layouts within the business center.
Renovated the cafe area to create a vibrant, inviting space for relaxation and informal meetings, incorporating modern fixtures, furniture, and finishes.
Designed and built contemporary open office areas with collaborative spaces, ergonomic furniture, and flexible layouts to support productivity and innovation.
Integrated cutting-edge smart technology solutions, including automated lighting, temperature control, and security systems, to enhance efficiency and convenience within the business center.
Managed all necessary governmental paperwork and permits to ensure full compliance with local regulations and smooth execution of the project.

Result

The renovation and fit-out of the business center were completed successfully, delivering a modern, high-functioning workspace that meets the client’s requirements for both aesthetics and performance. Crest View executed the project with precision and attention to detail, creating an environment that enhances productivity and leaves a lasting impression on visitors and clients. The final result is a state-of-the-art business center that reflects the client’s commitment to quality and innovation while offering a comfortable and professional setting for all.

What Customers Say?

“Crest View did an exceptional job designing and fitting out our office. The integration of smart office technologies and ergonomic furniture has greatly improved our workspace functionality. Their ability to meet all the required regulations and ensure compliance with local laws gave us peace of mind, and the project was completed on time, as promised.”